Inter Pipeline Office Expansion

Location

Sherwood Park, AB

Area of focus

Corporate Offices

Contract Type

Design build

Contract Value

$5,110,000

Year completed

2014

Owner / Consultant

Inter Pipeline / ACI Architects

Description

This project was a complete design build for the 3 level office expansion, totalling 11,500 sq. ft. The expansion included a new pipeline control room on one entire floor that incorporated 8 client supplied state of the art consoles. Also included was a new multi-purpose room with all new AV equipment for companywide meetings and training along with many offices.

We were challenged with tying this expansion into the existing building at 2 locations in order to create a functional flow for the entire office. Another unique challenge on this project was the installation of the all new deep sanitary lines as the existing property was utilizing septic tanks. The municipality required us to case bore under a major road in Sherwood Park in order to tie into the nearest sanitary main. Once the line was brought onto the property we were faced with trenching through the parking lot and eliminating the existing septic tanks in use.

We created a close working relationship with the client on this project as their office remained occupied while renovating at the various tie in locations. This relationship lead to a very smooth construction process with a timely turnover and a great final product.

Location

Sherwood Park, AB

Area of focus

Corporate Offices

Contract Type

Design build

Contract Value

$5,110,000

Year completed

2014

Owner / Consultant

Inter Pipeline / ACI Architects